Skip to content

Resources

Tools for your next project. Start with a calculation.

Use the public calculators without signing in. For a complete solar design, explore the designer and create an account to save your work.

Guides

Reference articles for the rules behind the tools.

The NEC sections, design conventions, and inspection checks that drive what the calculators output. Bookmark for the next plan check or AHJ conversation.

Planset

Solar Planset Requirements: 20 Ingredients Ranked

What goes in a solar plan set, and which parts actually decide approval. Every ingredient scored on approval impact, field impact, effort by hand, and how much a tool can own. Includes a pre-submittal checklist.

Read the guide

Grounding & bonding

Subpanels: Why Neutral and Ground Are Separated

Why the bond happens once at the service and nowhere else, what a second bond does to normal load current, and how a gateway or a new disconnect turns an existing main panel into a subpanel that still has its bond in it.

Read the guide

NEC Compliance

The 83% Rule and Solar Feeder Taps

A dwelling feeder sized at 83% under NEC 310.12 does not stop qualifying when solar taps it. Article 705 adds a second test. What changes, the two resolutions the trade uses, and how to avoid the problem entirely.

Read the guide

NEC Compliance

The 120% Rule vs Power Control Systems

What the solar 120% rule (NEC 705.12) is, how an NEC 705.13 Power Control System differs, when a PCS lets you skip a service upgrade, and where the 120% rule still applies.

Read the guide

NEC Compliance

The Solar 120% Rule (NEC 705.12), Done Right

The 120% busbar rule with the correct citation for every code cycle (2017, 2020, 2023), worked examples, which breaker counts on MLO panels, subpanel propagation, and every fix when a design fails it.

Read the guide

NEC Compliance

PV String Sizing, Explained Properly

The full variable checklist behind NEC 690.7: eight panel inputs, six inverter constraints, ASHRAE temperature corrections, per-MPPT current limits, and the step-by-step math.

Read the guide

NEC Compliance

Service Disconnect Locations

The two-layer problem: NEC 230 and 705 are the floor, but the utility interconnection rules are where a code-perfect planset still gets rejected. Both layers, with the common rejection causes called out.

Read the guide

Solar Design

Solar Wiring Diagram Guide

What every PV (and PV + storage) wiring diagram needs: the single-line and its conductor callouts, conductor schedule, OCPD, EGC, AC disconnects, and the labels every AHJ checks.

Read the guide

Solar Design

Solar Panel Row Spacing

How inter-row spacing is computed at the worst-case sun angle of the year, with a live 3D viewer that rotates as you change azimuth and tilt.

Read the guide

Beyond the calculators

These tools are part of a bigger platform.

Bring equipment, roof layout and electrical connections together in Solar Design Lab. Review the design checks and schedules as you work. See pricing for project access and separately quoted engineering services.