Solar permit requirements in Winter Park, FL
Solar installations in Winter Park, Florida, must adhere to specific local design parameters and utility requirements. Solar Design Lab provides permit-ready plansets designed to meet these municipal standards.
Requirements at a glance
- Design wind speed
- 140 mph (ASCE)
- Exposure category
- B
- High-velocity hurricane zone
- No
- Submission format
- Digital submission
- Separate discipline files
- No
What Winter Park expects on a solar permit
The City of Winter Park requires designs to account for a wind speed of 140 mph and Exposure Category B. All permit submissions must be delivered digitally. If the utility provider is the City of Winter Park, the system diagram and one-line drawing must include a PV meter. Additionally, the one-line drawing must follow the formatting example provided on the City of Winter Park Going Solar web page.
- IF Utility is City of Winter Park, then Include a PV meter in the system diagram and one-line drawing.
- [documentation] Format the one-line drawing to match the specific example provided on the City of Winter Park 'Going Solar' web page.