Florida AHJ

Solar permit requirements in Weston, FL

Solar installations in Weston, Florida, must comply with Broward County building codes and High Velocity Hurricane Zone standards. Applicants must follow specific structural and fire safety protocols to secure permit approval.

Requirements at a glance

Design wind speed
170 mph (ASCE)
Exposure category
C
Ground snow load
0 psf
High-velocity hurricane zone
Yes
Fire access pathways
Required
Submission format
Digital submission
Separate discipline files
No

What Weston expects on a solar permit

Weston requires structural designs based on 170 mph wind speeds, Exposure Category C, and Risk Category II. Submissions must include an inspection schedule, a backup configuration load calculation, and plans showing 36-inch fire access pathways and specific ridge setbacks. The jurisdiction mandates a Special Building Inspector form signed by a Florida licensed professional, along with progress reports and a post-installation Letter of Compliance. A Certificate of Compliance is required before the final inspection, and all lag screw attachments must achieve 3 inches of embedment into roof trusses. All permit applications must be submitted through digital delivery.

  • [documentation] Requires a 'Special Building Inspector' form (signed and sealed by a FL Licensed PE or Architect) for solar roof connections per Broward County Administrative Code Section 110.10.
  • [documentation] Requires an inspection schedule stating specific inspections and construction phases to be submitted with the permit application.
  • [documentation] Requires a Certificate of Compliance to be submitted prior to scheduling the final building inspection per Section 110.10.7.
  • [documentation] Requires progress and inspection reports to be submitted during construction in accordance with Section 110.10.6.
  • [structural] Requires structural design and calculations for 170 mph wind speed, Exposure Category C, and Risk Category II per FBC 2023/ASCE 7-22.
  • [documentation] Requires a post-installation PE-sealed 'Letter of Compliance' or special inspection report certifying that the structural and electrical installation matches approved plans.
  • [structural] Requires verification (and likely plan notation) that lag screw attachments achieve at least 3 inches of embedment into roof trusses.
  • [fire] Requires plans to explicitly show at least two 36-inch wide fire access pathways from gutter to ridge, with one located on the street or driveway side of the roof.
  • [fire] Requires ridge setbacks of 18 inches for roof coverage up to 33%, or 36 inches for coverage exceeding 33%.
  • [calcs] Requires a load calculation specifically for the backup configuration.