Florida AHJ

Solar permit requirements in Un-incorporated Palm Beach, FL

Solar projects in Un-incorporated Palm Beach must adhere to specific structural and electrical standards. Solar Design Lab provides permit-ready plansets that comply with these local regulations.

Requirements at a glance

Design wind speed
170 mph (ASCE)
Exposure category
B
Ground snow load
0 psf
High-velocity hurricane zone
No
Submission format
digital_separate
Separate discipline files
Yes

What Un-incorporated Palm Beach expects on a solar permit

Permit applications require digital submission with separate discipline files. Structural designs must account for a wind speed of 170 mph, Exposure B, and Risk Category II per FBC 2023 and ASCE 7-22. Documentation must include electrical and structural certifications by a Florida-licensed PE referencing Florida Statute 377.705. Additional requirements include a 36-inch ridge setback if PV arrays occupy more than 33 percent of the roof area and the use of reflective PV system labels with 3/8 inch lettering. Electrical specifications require a service-entrance rated PV AC disconnect for supply side connections and a 200A rated MSP with a 200A main breaker for Tier 2 systems. Installations must also include 10-year non-removable battery-operated smoke alarms in sleeping rooms and adjacent areas.

  • [structural] Design structures for a wind speed of 170 mph, Exposure B, and Risk Category II per FBC 2023 and ASCE 7-22.
  • [labeling] Use reflective PV system labels with a minimum letter height of 3/8 inch per NFPA 1-11.12.2.1.1.2.
  • [calcs] Calculate EV charger loads at 100% in the electrical load calculations.
  • [fire] Provide a minimum 36-inch ridge setback if PV arrays occupy more than 33 percent of the plan view roof area.
  • [documentation] Include electrical and structural certifications by a Florida-licensed PE referencing Florida Statute 377.705.
  • [electrical] Specify a service-entrance rated PV AC disconnect if connected to the supply side of the service.
  • [electrical] Specify a 200A rated Main Service Panel (MSP) with a 200A main breaker for Tier 2 solar systems.
  • [fire] Specify 10-year non-removable, non-replaceable battery-operated smoke alarms in sleeping rooms and adjacent areas.

Design a permit-ready Un-incorporated Palm Beach planset with these rules baked in.

Solar Design Lab derives the SLD, electrical, and structural live as you draw, and checks your design against Florida AHJ requirements before you submit. First planset free.

Browse all Florida jurisdictions