Florida AHJ

Solar permit requirements in Un-incorporated Hendry, FL

Solar installers and homeowners in Un-incorporated Hendry must follow specific guidelines for permit approval. Solar Design Lab provides permit-ready plansets that adhere to these local standards.

Requirements at a glance

Design wind speed
150 mph (ASCE)
Exposure category
B
Ground snow load
0 psf
High-velocity hurricane zone
No
Submission format
Digital submission
Separate discipline files
No

What Un-incorporated Hendry expects on a solar permit

Permit applications in Un-incorporated Hendry require structural designs based on a 150 mph wind speed and Exposure Category B. All electrical and structural plans must be submitted as separate digital documents. Documentation must include engineer plans that are signed and sealed, a digitally signed affidavit, and an Engineer's Letter of Compliance based on a special inspection of the roof and solar installation.

  • [submittal_format] Submit electrical and structural plans as separate documents.
  • [structural] Design for 150 mph wind speed (FBC 2023/ASCE 7-22) and Exposure Category B.
  • [documentation] Ensure engineer plans are signed and sealed, and include a digitally signed affidavit.
  • [documentation] Provide an Engineer's Letter of Compliance based on a special inspection of the roof and solar installation.

Design a permit-ready Un-incorporated Hendry planset with these rules baked in.

Solar Design Lab derives the SLD, electrical, and structural live as you draw, and checks your design against Florida AHJ requirements before you submit. First planset free.

Browse all Florida jurisdictions