Solar installations in Un-incorporated Gwinnett must adhere to specific structural design parameters. These requirements ensure that all solar projects comply with local building standards.
Requirements at a glance
- Design wind speed
- 105 mph (ASCE)
- Exposure category
- B
- Ground snow load
- 20 psf
- High-velocity hurricane zone
- No
- Hard copy required
- No
- Separate discipline files
- No
What Un-incorporated Gwinnett expects on a solar permit
The jurisdiction requires designs to account for a wind speed of 105 mph and Exposure Category B. Additionally, projects must meet a ground snow load of 20 psf.
Design a permit-ready Un-incorporated Gwinnett planset with these rules baked in.