Solar permit requirements in Redington Shores, FL
Solar installations in Redington Shores, Florida, must adhere to specific local permitting standards. These requirements ensure that all solar projects meet the safety and structural criteria established for Pinellas County.
Requirements at a glance
- Design wind speed
- 150 mph (ASCE)
- Exposure category
- B
- Ground snow load
- 0 psf
- High-velocity hurricane zone
- No
- Submission format
- Hard copy required
- Separate discipline files
- No
What Redington Shores expects on a solar permit
The jurisdiction requires designs to account for a wind speed of 150 mph and Exposure Category B. The ground snow load is 0 psf. All permit applications must be submitted as a hardcopy.