Solar permit requirements in Redington Shores, FL

Solar installations in Redington Shores, Florida, must adhere to specific local permitting standards. These requirements ensure that all solar projects meet the safety and structural criteria established for Pinellas County.

Requirements at a glance

Design wind speed
150 mph (ASCE)
Exposure category
B
Ground snow load
0 psf
High-velocity hurricane zone
No
Submission format
Hard copy required
Separate discipline files
No

What Redington Shores expects on a solar permit

The jurisdiction requires designs to account for a wind speed of 150 mph and Exposure Category B. The ground snow load is 0 psf. All permit applications must be submitted as a hardcopy.