Skip to content

NY AHJ

Solar permit requirements in Ramapo, NY

Solar installations in Ramapo, Rockland County, must adhere to specific structural design parameters. These requirements ensure that solar energy systems meet local safety standards.

Requirements at a glance

Design wind speed
115 mph (ASCE)
Exposure category
B
Ground snow load
30 psf

What Ramapo expects on a solar permit

The jurisdiction of Ramapo, NY, requires solar projects to be designed for a wind speed of 115 mph under exposure category B. Additionally, all solar designs must account for a ground snow load of 30 psf.

Design a permit-ready Ramapo planset with these rules baked in.

Solar Design Lab derives the SLD, electrical, and structural live as you draw, and checks your design against the AHJ's requirements before you submit. Explore project pricing.

Browse all jurisdictions