Florida AHJ

Solar permit requirements in Ponce de Leon, FL

Solar installations in Ponce de Leon, Holmes County, must adhere to specific local design parameters. Understanding these requirements is necessary for a successful permitting process.

Requirements at a glance

Design wind speed
130 mph (ASCE)
Exposure category
B
Ground snow load
0 psf
High-velocity hurricane zone
No
Submission format
Digital submission
Separate discipline files
No

What Ponce de Leon expects on a solar permit

The jurisdiction requires solar designs to meet a wind speed of 130 mph and Exposure Category B. The ground snow load is 0 psf. Submissions are accepted via digital delivery.

Design a permit-ready Ponce de Leon planset with these rules baked in.

Solar Design Lab derives the SLD, electrical, and structural live as you draw, and checks your design against Florida AHJ requirements before you submit. First planset free.

Browse all Florida jurisdictions