Solar permit requirements in Plantation, FL

Solar installations in Plantation, Broward County, must comply with specific local and state building codes. These requirements ensure safety and structural integrity for all residential and commercial solar projects.

Requirements at a glance

Design wind speed
170 mph (ASCE)
Exposure category
C
Ground snow load
0 psf
High-velocity hurricane zone
Yes
Fire access pathways
Required
Submission format
Digital submission
Separate discipline files
No

What Plantation expects on a solar permit

Plantation is a High-Velocity Hurricane Zone requiring design parameters of 170 mph wind speed and Exposure Category C. Applications must be submitted digitally and include a rapid shutdown pathway placard. Projects require a Special Structural Inspector, a signed and sealed Structural Inspection Form, and a final Certificate of Compliance per Broward County Administrative Code 110.10. Documentation must include roof sealant specifications with Miami-Dade NOA, waterproofing details, and roof access pathways. Electrical plans must show intersystem bonding, surge protection, and a minimum 22k AIC rating for service equipment. Additionally, provide a floor plan showing smoke and CO detector locations, a scaled elevation for ESS placement relative to flood elevation, and a power source directory.

  • Add a floor plan showing locations for smoke/CO detectors inside and outside all bedrooms per FBC 2023 Level 1 alteration requirements.
  • [structural] Retain a Special Structural Inspector (FL Architect or PE) and submit an inspection schedule with the application, a signed/sealed Structural Inspection Form (SIF), and a final Certificate of Compliance per Broward County Admin Code 110.10.
  • [documentation] Provide roof sealant specifications (including Miami-Dade NOA) approved and signed by the designer of record per FBC 107 and R324.4.3, and include manufacturer-approved applicator certification if required by the NOA.
  • [fire] Show roof access pathways at least 36 inches wide on each roof plane per FBC R324.6.1, and 18-inch ridge pathways per NFPA 1 11.12.3.2.3 if PV coverage is under 33%.
  • [documentation] Provide a scaled elevation showing the ESS location relative to structure openings and demonstrating compliance with the Broward County Ord Sec 5-84 base flood elevation.
  • [fire] Provide a floor plan with labeled rooms showing hardwired smoke/CO detector locations with battery backup, and specify AFCI protection for their circuits.
  • [electrical] Specify service equipment with a minimum 22k AIC rating, or provide utility calculations demonstrating less than 10k AIC is available at the service.(LIKELY MPUs ONLY)
  • [electrical] Explicitly show intersystem bonding (NEC 250.94), GEC connection to the cold water pipe (NEC 250.104(A)), and a surge protection device (NEC 230.67) on the electrical riser diagram. (SURGE PROTECTION REQUIRED FOR NEW MAIN PANELS)
  • [submittal_format] Submit a signed and notarized affidavit from the designer of record (including property address and scope of work) if plans are not digitally signed.
  • [structural] Design structural calculations for 170 mph wind speed and Exposure Category C.
  • [structural] Explicitly include and mark waterproofing details in the scope of work per FBC 107.2.1.
  • [labeling] Ensure the power source directory explicitly lists all sources of power on the building, including any existing PV systems.

Design a permit-ready Plantation planset with these rules baked in.