Florida AHJ
Solar permit requirements in Pembroke Pines, FL
Solar installations in Pembroke Pines, Broward County, must adhere to specific local and state building codes. As a High-Velocity Hurricane Zone, the jurisdiction mandates strict structural and electrical documentation for all solar projects.
Requirements at a glance
- Design wind speed
- 170 mph (ASCE)
- Exposure category
- C
- Ground snow load
- 0 psf
- High-velocity hurricane zone
- Yes
- Fire access pathways
- Required
- Submission format
- digital_separate
- Separate discipline files
- Yes
What Pembroke Pines expects on a solar permit
Structural designs must account for 170 mph wind speeds, Exposure Category C, and Risk Category II per FBC 2023 and ASCE 7-22. Applications require separate digital files for electrical and structural trades, with product approval documents submitted as distinct files rather than part of the plan set. Plan corrections must be clouded with an accompanying response narrative. Special requirements include submitting a Form for Special Building Inspector for mounting and waterproofing, an inspection schedule, and a Certificate of Compliance per Broward County Code 110.10. Electrical documentation must include racking bonding details, UL 3741 listing documentation, and a Rapid-Shutdown Commissioning Affidavit. Fire safety design must comply with the FFPC 8th Edition, and all systems must include a rapid shutdown pathway placard and permanent service equipment labeling.
- [documentation] Submit a 'Form for Special Building Inspector' signed by a FL Registered Architect or Licensed Engineer for solar mounting system attachment, truss connections, and waterproofing per Broward County Code 110.10.
- [documentation] Submit an inspection schedule with the permit application stating the specific inspections that will be made and at what phase of construction.
- [structural] Structural design must account for 170 mph wind speed, Exposure Category C, and Risk Category II per FBC 2023/ASCE 7-22.
- [electrical] Provide the racking manufacturer's electrical bonding details specifically for the combination of racking, modules, and microinverters/optimizers (referencing UL2703, UL1703, UL1741).
- [documentation] Provide UL 3741 PV Hazard Control System listing documentation and manufacturer addendums (e.g., IronRidge/Tesla MCI installation instructions).
- [documentation] Provide complete Notice of Acceptance (NOA) documents for all specified products, including all pages and highlighted installation instructions, not just the cover page.
- [documentation] Submit a Certificate of Compliance from the Special Inspector prior to scheduling the final building inspection per Section 110.10.7.
- [documentation] Submit a notarized PV System Rapid-Shutdown Commissioning Affidavit signed by the qualifying agent prior to scheduling the final inspection.
- [fire] Fire safety design must comply with FFPC 8th Edition including Broward County Amendments.
- [electrical] The single-line diagram and String & Fire Safety Plan must identify the specific MCI type (MCI-1 or MCI-2) in a symbol directory and show the location of the Rapid Shutdown Initiation Device.
- [labeling] The PV system directory label and a permanent plaque at the service equipment must show the location of the Rapid Shutdown Initiation Device and all power source disconnects.
- [submittal_format] All plan corrections must be clouded on the drawings and accompanied by a response narrative describing how each review comment was addressed.
- [documentation] Submit progress and inspection reports during construction in accordance with Broward County Administrative Code Section 110.10.6.
- [submittal_format] As of March 22nd 2024, construction documents must be batched into one file per trade (separate electrical and structural sets), and product approval documents (NOAs) must not be included in the plan set file.
Design a permit-ready Pembroke Pines planset with these rules baked in.
Solar Design Lab derives the SLD, electrical, and structural live as you draw, and checks your design against Florida AHJ requirements before you submit. First planset free.