Florida AHJ
Solar permit requirements in Palm Shores, FL
Solar installations in Palm Shores, Brevard County, must adhere to specific local design parameters. These standards ensure that all solar projects meet regional safety and structural requirements.
Requirements at a glance
- Design wind speed
- 150 mph (ASCE)
- Exposure category
- B
- Ground snow load
- 0 psf
- High-velocity hurricane zone
- No
- Submission format
- Digital submission
- Separate discipline files
- No
What Palm Shores expects on a solar permit
The jurisdiction requires designs to account for a wind speed of 150 mph and Exposure Category B. The ground snow load is 0 psf. Palm Shores is not located in a High-Velocity Hurricane Zone. All permit applications must be submitted through a digital delivery process.
Design a permit-ready Palm Shores planset with these rules baked in.
Solar Design Lab derives the SLD, electrical, and structural live as you draw, and checks your design against Florida AHJ requirements before you submit. First planset free.