Florida AHJ
Solar permit requirements in Palm Beach Gardens, FL
Securing a solar permit in Palm Beach Gardens, Florida, requires adherence to specific local design parameters. These standards ensure that all solar installations meet regional safety and structural requirements.
Requirements at a glance
- Design wind speed
- 170 mph (ASCE)
- Exposure category
- B
- Ground snow load
- 0 psf
- High-velocity hurricane zone
- No
- Submission format
- Hard copy required
- Separate discipline files
- No
What Palm Beach Gardens expects on a solar permit
The jurisdiction mandates a design wind speed of 170 mph with an exposure category of B. The ground snow load is 0 psf. Palm Beach Gardens requires hardcopy submission for all permit applications.
Design a permit-ready Palm Beach Gardens planset with these rules baked in.
Solar Design Lab derives the SLD, electrical, and structural live as you draw, and checks your design against Florida AHJ requirements before you submit. First planset free.