Florida AHJ

Solar permit requirements in New Smyrna Beach, FL

Solar installations in New Smyrna Beach must adhere to specific local design parameters. Solar Design Lab provides permit-ready plansets tailored to these requirements for projects in Volusia County.

Requirements at a glance

Design wind speed
140 mph (ASCE)
Exposure category
B
Ground snow load
0 psf
High-velocity hurricane zone
No
Submission format
Digital submission
Separate discipline files
No

What New Smyrna Beach expects on a solar permit

The jurisdiction requires solar designs to account for a wind speed of 140 mph and exposure category B. There is no ground snow load for this area. Submissions are accepted via digital delivery, and hardcopy submissions are not required.

Design a permit-ready New Smyrna Beach planset with these rules baked in.

Solar Design Lab derives the SLD, electrical, and structural live as you draw, and checks your design against Florida AHJ requirements before you submit. First planset free.

Browse all Florida jurisdictions