Florida AHJ
Solar permit requirements in New Smyrna Beach, FL
Solar installations in New Smyrna Beach must adhere to specific local design parameters. Solar Design Lab provides permit-ready plansets tailored to these requirements for projects in Volusia County.
Requirements at a glance
- Design wind speed
- 140 mph (ASCE)
- Exposure category
- B
- Ground snow load
- 0 psf
- High-velocity hurricane zone
- No
- Submission format
- Digital submission
- Separate discipline files
- No
What New Smyrna Beach expects on a solar permit
The jurisdiction requires solar designs to account for a wind speed of 140 mph and exposure category B. There is no ground snow load for this area. Submissions are accepted via digital delivery, and hardcopy submissions are not required.
Design a permit-ready New Smyrna Beach planset with these rules baked in.
Solar Design Lab derives the SLD, electrical, and structural live as you draw, and checks your design against Florida AHJ requirements before you submit. First planset free.