Solar installations in Moore Haven, Florida, must adhere to specific local design parameters. These requirements ensure that solar energy systems meet the safety standards established by Glades County.

Requirements at a glance

Design wind speed
150 mph (ASCE)
Exposure category
B
Ground snow load
0 psf
High-velocity hurricane zone
No
Submission format
Digital submission
Separate discipline files
No

What Moore Haven expects on a solar permit

The jurisdiction requires designs to account for a wind speed of 150 mph and exposure category B. The ground snow load is 0 psf. All submissions must be provided in a digital format, as hardcopy submissions are not required.

Design a permit-ready Moore Haven planset with these rules baked in.

Solar Design Lab derives the SLD, electrical, and structural live as you draw, and checks your design against Florida AHJ requirements before you submit. First planset free.