Florida AHJ

Solar permit requirements in Milton, FL

Solar installations in Milton, Florida, must adhere to specific design parameters set by Santa Rosa County. Understanding these requirements is the first step toward a successful permit application.

Requirements at a glance

Design wind speed
150 mph (ASCE)
Exposure category
B
Ground snow load
0 psf
High-velocity hurricane zone
No
Submission format
Digital submission
Separate discipline files
No

What Milton expects on a solar permit

The jurisdiction requires designs to account for a wind speed of 150 mph and exposure category B. The ground snow load is 0 psf. All permit applications must be submitted through a digital delivery process.

Design a permit-ready Milton planset with these rules baked in.

Solar Design Lab derives the SLD, electrical, and structural live as you draw, and checks your design against Florida AHJ requirements before you submit. First planset free.

Browse all Florida jurisdictions