Florida AHJ
Solar permit requirements in Lee, FL
Solar installations in Lee, Florida must adhere to specific local design parameters. These requirements ensure that solar energy systems meet the safety standards established by Madison County.
Requirements at a glance
- Design wind speed
- 120 mph (ASCE)
- Exposure category
- B
- Ground snow load
- 0 psf
- High-velocity hurricane zone
- No
- Submission format
- Digital submission
- Separate discipline files
- No
What Lee expects on a solar permit
The jurisdiction requires solar designs to account for a wind speed of 120 mph and Exposure Category B. The ground snow load is 0 psf. Submissions are accepted through digital delivery.
Design a permit-ready Lee planset with these rules baked in.
Solar Design Lab derives the SLD, electrical, and structural live as you draw, and checks your design against Florida AHJ requirements before you submit. First planset free.