Florida AHJ

Solar permit requirements in Lee, FL

Solar installations in Lee, Florida must adhere to specific local design parameters. These requirements ensure that solar energy systems meet the safety standards established by Madison County.

Requirements at a glance

Design wind speed
120 mph (ASCE)
Exposure category
B
Ground snow load
0 psf
High-velocity hurricane zone
No
Submission format
Digital submission
Separate discipline files
No

What Lee expects on a solar permit

The jurisdiction requires solar designs to account for a wind speed of 120 mph and Exposure Category B. The ground snow load is 0 psf. Submissions are accepted through digital delivery.

Design a permit-ready Lee planset with these rules baked in.

Solar Design Lab derives the SLD, electrical, and structural live as you draw, and checks your design against Florida AHJ requirements before you submit. First planset free.

Browse all Florida jurisdictions