Florida AHJ
Solar permit requirements in Lantana, FL
Installing solar panels in Lantana, Palm Beach County, requires adherence to specific local design and submission standards. Solar Design Lab provides permit-ready plansets tailored to these jurisdiction requirements.
Requirements at a glance
- Design wind speed
- 170 mph (ASCE)
- Exposure category
- B
- Ground snow load
- 0 psf
- High-velocity hurricane zone
- No
- Submission format
- Hard copy required
- Separate discipline files
- No
What Lantana expects on a solar permit
Solar installations in Lantana must meet design parameters of 170 mph wind speed and Exposure Category B. There is no ground snow load requirement for this area. The jurisdiction requires hardcopy submission for all permit applications.
Design a permit-ready Lantana planset with these rules baked in.
Solar Design Lab derives the SLD, electrical, and structural live as you draw, and checks your design against Florida AHJ requirements before you submit. First planset free.