Florida AHJ
Solar permit requirements in Hawthorne, FL
Solar installations in Hawthorne, Florida, must adhere to specific local design parameters. Solar Design Lab provides permit-ready plansets designed to meet these jurisdictional requirements.
Requirements at a glance
- Design wind speed
- 130 mph (ASCE)
- Exposure category
- B
- Ground snow load
- 0 psf
- High-velocity hurricane zone
- No
- Submission format
- Digital submission
- Separate discipline files
- No
What Hawthorne expects on a solar permit
The jurisdiction of Hawthorne in Alachua County requires solar designs to account for a wind speed of 130 mph and Exposure Category B. The ground snow load for this area is 0 psf. All permit applications must be submitted through digital delivery.
Design a permit-ready Hawthorne planset with these rules baked in.
Solar Design Lab derives the SLD, electrical, and structural live as you draw, and checks your design against Florida AHJ requirements before you submit. First planset free.