Florida AHJ
Solar permit requirements in Greenville, FL
Solar installers and homeowners in Greenville, Madison County, must adhere to local design parameters for all solar energy systems. Understanding these requirements is the first step toward a successful permit application.
Requirements at a glance
- Design wind speed
- 120 mph (ASCE)
- Exposure category
- B
- Ground snow load
- 0 psf
- High-velocity hurricane zone
- No
- Submission format
- Digital submission
- Separate discipline files
- No
What Greenville expects on a solar permit
Greenville requires solar designs to account for a wind speed of 120 mph and exposure category B. The ground snow load for this jurisdiction is 0 psf. All permit applications must be submitted through digital delivery.
Design a permit-ready Greenville planset with these rules baked in.
Solar Design Lab derives the SLD, electrical, and structural live as you draw, and checks your design against Florida AHJ requirements before you submit. First planset free.