Florida AHJ

Solar permit requirements in Destin, FL

Solar installations in Destin, Florida, must adhere to specific local design parameters. These requirements ensure that all residential and commercial solar projects meet safety and structural standards.

Requirements at a glance

Design wind speed
150 mph (ASCE)
Exposure category
B
Ground snow load
0 psf
High-velocity hurricane zone
No
Submission format
Digital submission
Separate discipline files
No

What Destin expects on a solar permit

The jurisdiction requires solar designs to account for a wind speed of 150 mph and exposure category B. The ground snow load is 0 psf. All permit applications must be submitted through the digital delivery preference.

Design a permit-ready Destin planset with these rules baked in.

Solar Design Lab derives the SLD, electrical, and structural live as you draw, and checks your design against Florida AHJ requirements before you submit. First planset free.

Browse all Florida jurisdictions