Florida AHJ

Solar permit requirements in Century, FL

Solar installers and homeowners in Century, Florida, must adhere to specific structural design parameters for solar energy systems. These requirements ensure that all installations meet local building standards.

Requirements at a glance

Design wind speed
150 mph (ASCE)
Exposure category
B
Ground snow load
0 psf
High-velocity hurricane zone
No
Submission format
Digital submission
Separate discipline files
No

What Century expects on a solar permit

The jurisdiction of Century in Escambia County requires solar designs to account for a wind speed of 150 mph and exposure category B. The ground snow load is 0 psf, and the area is not classified as a High-Velocity Hurricane Zone. All permit submissions must be delivered through a digital format.

Design a permit-ready Century planset with these rules baked in.

Solar Design Lab derives the SLD, electrical, and structural live as you draw, and checks your design against Florida AHJ requirements before you submit. First planset free.

Browse all Florida jurisdictions