Florida AHJ
Solar permit requirements in Century, FL
Solar installers and homeowners in Century, Florida, must adhere to specific structural design parameters for solar energy systems. These requirements ensure that all installations meet local building standards.
Requirements at a glance
- Design wind speed
- 150 mph (ASCE)
- Exposure category
- B
- Ground snow load
- 0 psf
- High-velocity hurricane zone
- No
- Submission format
- Digital submission
- Separate discipline files
- No
What Century expects on a solar permit
The jurisdiction of Century in Escambia County requires solar designs to account for a wind speed of 150 mph and exposure category B. The ground snow load is 0 psf, and the area is not classified as a High-Velocity Hurricane Zone. All permit submissions must be delivered through a digital format.
Design a permit-ready Century planset with these rules baked in.
Solar Design Lab derives the SLD, electrical, and structural live as you draw, and checks your design against Florida AHJ requirements before you submit. First planset free.