Florida AHJ

Solar permit requirements in Callaway, FL

Solar installations in Callaway, Bay County, must adhere to specific local design parameters. These requirements ensure that all solar projects meet regional safety standards.

Requirements at a glance

Design wind speed
140 mph (ASCE)
Exposure category
B
Ground snow load
0 psf
High-velocity hurricane zone
No
Submission format
Digital submission
Separate discipline files
No

What Callaway expects on a solar permit

The City of Callaway requires solar designs to account for a wind speed of 140 mph and Exposure Category B. The ground snow load for this jurisdiction is 0 psf. All permit applications must be submitted through a digital delivery process.

Design a permit-ready Callaway planset with these rules baked in.

Solar Design Lab derives the SLD, electrical, and structural live as you draw, and checks your design against Florida AHJ requirements before you submit. First planset free.

Browse all Florida jurisdictions