Solar permit requirements in Bunnell, FL
Solar installations in Bunnell, Flagler County, must adhere to local design parameters for safety and compliance. Solar Design Lab provides permit-ready plansets designed to meet these specific jurisdictional requirements.
Requirements at a glance
- Design wind speed
- 150 mph (ASCE)
- Exposure category
- B
- Ground snow load
- 0 psf
- High-velocity hurricane zone
- No
- Submission format
- Digital submission
- Separate discipline files
- No
What Bunnell expects on a solar permit
Bunnell requires solar designs to account for a wind speed of 150 mph and Exposure Category B. The ground snow load for this jurisdiction is 0 psf. All permit documentation must be submitted through the digital delivery preference.